BIM Coordinator according to ISO 19650

  1. HOME
  2. >
  3. Course
  4. >
  5. BIM Coordinator
BIM Coordinator

BIM Coordinator according to ISO 19650

For whom?

Training dedicated to people interested in BIM, architects, engineers, research and teaching staff who want to acquire the skills of a BIM Coordinator or BIM Manager.

  • Number of days: 4
  • Duration: 32 h
  • Materials: YES

Educational goals

Participants will acquire the necessary information regarding the coordination and management of a BIM project, and will acquire the skills to standardize work.

Course schedule: BIM Coordinator

Day 1

BIM advantages and disadvantages

  • Digital Twin – the future is today!
  • BIM and the big picture of digital transformation
  • Why and how to switch to BIM?

BIM Coordinator and other team 

  • Roles and responsibilities
  • Characteristics and skills of the BIM Coordinator
  • What is BIM Coordination?
  • Industry coordination
  • Cross-sectoral coordination

Determination of coordinates

  • Workshop on determining shared coordinates for multiple models on the example of Autodesk Revit

Day 2

Revit Template and Settings

  • Project Browser Organization
  • Shared parameters
  • Title page
  • Creating Annotative Families View Templates

Coordination within one

  • Creating BIM models based on standards and the best
  • Verification of BIM models (on the example of Revit Model Checker)

Designer and contractor process documents

  • Cycle of information delivery in BIM based on standards
  • ISO 19650
  • Exchange information requirements (EIR)
  • Discussion of sample EIR documents
  • Analysis of the Exchange information requirements
  • Structure of the BIM Execution Plan (BEP) on the basis of a case study of investments implemented in Poland

Day 3

Designer and contractor process documents

  • OIR – Organization Information Requirements
  • AIR – Asset Information Requirements (for the facility)
  • PIR – Project Information Requirements
  • AIM – Asset Information Model
  • PIM – Project information model

Information exchange using OpenBIM

  • Rules for correct export to IFC

CDE processes and solutions

  • CDE processes according to ISO 19650
  • Functionalities and administration on the example of
  • selected CDE platforms (BIM360 Docs and G4CDE)
  • Configuration of the CDE environment

DAY 4

Coordination meetings and meetings

  • Rules and common coordination meeting errors
  • Using platforms to manage tasks (e.g. Plannerly) in the BIM project
  • The use of agile elements of management methods
  • in construction projects

Interdisciplinary coordination process 

  • Coordination process according to ISO 19650

Coordination and quality assurance of BIM models (on the example of Autodesk Navisworks + Newforma Konekt)

  • Federating files from different sources
  • Tools for viewing and marking models
  • Virtual tour of the facility
  • Establishing Review Rules
  • Collision detection and grouping
  • Control and reporting of BIM team work results

Exchange and resolution of issues (Issues)

  • Creating and managing a project in BIM Track (Newforma Konekt)
  • Allocation of collisions to appropriate persons
  • Analysis of results
  • Resolving and Closing Issues

 